- Products
- Mechanical and remote handling
- Remotely operated vehicles
- Engineered containments and gloveboxes
- Modular and containerised systems
- Radiation tolerant equipment
- Radioactive sources
- Safety related systems
- Shielded equipment and facilities
- High-integrity control systems
- Safety case development
- Safety case substantiation
- Safety system design
- 3D modelling
- Configuration management
- Design analysis
- Design consultancy
- PES and control systems
- Software lifecycle processes and programming
- 3D modelling and data handling
- Building infrastructure and services
- LASER scanning
- Optical and radiation surveys
- Plant and waste characterisation
- SONAR scanning
- Through-life support
- Remote inspection systems
- Radioactive source store
- Long Reach tooling solutions
- Removal of structural feature from MEB
- Rodman II commissioning
- Archive
- JFN planted 500 trees with the West Cumbria Rivers Trust
- National Apprenticeship Week
- JFN awarded renewal of Sellafield ROV contract by The Decommissioning Alliance
- NDL win multi-million pound HALSEF decommissioning strategy project
- Archive
JFN Helping out during Covid-19
Sales Enquiry
- RodMan 2 successfully commissioned at Sellafield
- Fukushima support contract win
- Reactor decommissioning - Magnox engages JFN's core capabilities
- BEPPS - DIF getting it right first time
- James Fisher Nuclear rugby 7s
- International co-operation to understand decommissioning challenges
- Major decommissioning framework agreement with Sellafield
- Cutting the problem down to size
- James Fisher Nuclear highly commended, The Engineer Magazine
- JFN joins forces with two new students for Dream Placement 2017
- Engineering a change.
- Dream Placement Update
- Inspection tool from James Fisher Nuclear providing vital information for EDF-Energy.
- JFN flying high with sellafield decommissioning
- SGHWR project reaches major milestone
- A Real Dream Placement
- JFN Supplying Key Components To The World’s Most Powerful Neutron Research Facility
- New Rig Hall in Caithness
- joint venture to support Dounreay nuclear decommissioning joint programme
- JFN Wins Contract For Vital Robotic Handling System at New International Research Facility
- JFN and CNSL Consortium first to reach 1 million hours safe working
- Women In Nuclear Annual Conference
- Dream Placement 2020
- SGHWR Milestone reached
- Covid-19 update
- JFN Receives RoSPA Gold award for 2020
- JFN Helping out during Covid-19
- Water Level Access Pontoons for Sellafield
- International Women in Engineering Day 2020
- BISP Concrete Shaving Trials
- Magnox SGHWR Core Segmentation Project
- First Design Contract Win at Dounreay
- NDL win multi-million pound HALSEF decommissioning strategy project
- JFN awarded renewal of Sellafield ROV contract by The Decommissioning Alliance
- National Apprenticeship Week
- JFN planted 500 trees with the West Cumbria Rivers Trust
JFN’s own John Comsa, a Design Engineer based at our Egremont facility has been busy 3D Printing visors for hospitals to help with their shortages during these difficult times.
John said:
“We have friends who are consultants, so it was easy to ask what they needed and pass it on. My printer had a head blockage at one point but I fast fixed it with a steel brush hair (0.35mm), then everything worked as it should. We also have had boxes to pack them in as we just moved house.”
JFN has pledged to support him in his efforts by paying his costs and making JFN’s own 3d printer available to create a 2nd production line. (John, we think you are doing a superb job, having already delivered a batch to ICU of Royal Preston Hospital.)