- Products
- Mechanical and remote handling
- Remotely operated vehicles
- Engineered containments and gloveboxes
- Modular and containerised systems
- Radiation tolerant equipment
- Radioactive sources
- Safety related systems
- Shielded equipment and facilities
- High-integrity control systems
- Safety case development
- Safety case substantiation
- Safety system design
- 3D modelling
- Configuration management
- Design analysis
- Design consultancy
- PES and control systems
- Software lifecycle processes and programming
- 3D modelling and data handling
- Building infrastructure and services
- LASER scanning
- Optical and radiation surveys
- Plant and waste characterisation
- SONAR scanning
- Through-life support
- Remote inspection systems
- Radioactive source store
- Long Reach tooling solutions
- Removal of structural feature from MEB
- Rodman II commissioning
- Archive
Long Reach Tooling Solutions
Supporting Decommissioning of the PFSP at Sellafield to provide a quick, efficient and cost-effective response to the challenges faced across the whole of the Pile Fuel Storage Pond (PFSP) decommissioning programme for Sellafield Ltd.
PFSP had previously followed the traditional route of design, build and then trialling of bespoke tooling. In order to progress projects cost effectively and speedily, the Sellafield project team looked for partners in the supply chain with the required experience, expertise and facilities to supply and test “commercial off-the-shelf” (COTS) or modified proprietary equipment. This COTS approach minimises the need for multiple, expensive and lengthy design and manufacturing tasks associated with bespoke equipment.