- Products
- Mechanical and remote handling
- Remotely operated vehicles
- Engineered containments and gloveboxes
- Modular and containerised systems
- Radiation tolerant equipment
- Radioactive sources
- Safety related systems
- Shielded equipment and facilities
- High-integrity control systems
- Safety case development
- Safety case substantiation
- Safety system design
- 3D modelling
- Configuration management
- Design analysis
- Design consultancy
- PES and control systems
- Software lifecycle processes and programming
- 3D modelling and data handling
- Building infrastructure and services
- LASER scanning
- Optical and radiation surveys
- Plant and waste characterisation
- SONAR scanning
- Through-life support
- Remote inspection systems
- Radioactive source store
- Long Reach tooling solutions
- Removal of structural feature from MEB
- Rodman II commissioning
- Archive
Consumables request form
Please note:
1) JFN advises that the number of consumables requested are limited to those quantities shown
2) JFN will dispatch the consumables, subject to availability, within 28 working days of receipt of the request
3) All consumables will require a purchase order