ModuMan® Trials and Testing
The prototype ModuMan 100 hydraulic manipulator successfully achieved 2000 hours of trials representing typical decommissioning tasks in a confined space under both wet and dry conditions.
ModuMan prototype testing was required to simulate as close as was reasonably practicable the operations of the manipulator within a waste retrieval decommis-sioning cell. The trials would evaluate the manipula-tor's effectiveness and reliability in performing a range of tasks specified by the client, which also represent-ed a range of typical decommissioning tasks.
JFN erected and commissioned a test rig in their Unit 14 rig hall facility in Egremont, which included a repli-ca of the waste retrieval cell provided by the client and to be used on the plant. This consisted of a modular stainless cell containment with viewing windows and incorporated CCTV cameras, a hose for washing the cell walls and tool storage. ModuMan was deployed through a port in the retrieval cell wall where it per-formed tasks relating to the management of ILW waste.
Download the ModuMan case study
Must-read blogs
- Non Gamstop Casino
 - Best Non Gamstop Casinos
 - Gambling Sites Not On Gamstop
 - UK Betting Sites Not On Gamstop
 - Gambling Sites Not On Gamstop
 - Betting Sites Not On Gamstop UK
 - Non Gamstop Casino Sites UK
 - Best Non Gamstop Casinos
 - Non Gamstop Casinos
 - Casinos Not On Gamstop
 - Best Non Gamstop Casinos 2025
 - Best Non Gamstop Casinos
 - Casino Not On Gamstop
 - Non Gamstop Casinos UK
 - Online Betting Sites UK
 - Non Gamstop Casino UK
 - Gambling Sites Not On Gamstop
 - UK Casino Not On Gamstop
 - Non Gamstop Casino Sites UK
 - Casino Sites Not On Gamstop
 - UK Casino Sites Not On Gamstop
 

								

